This website promotes the construction of a pedestrian bridge over the Deschênes Rapids.
Please click here for the results of the survey.
Thanks for your feedback.

In Gatineau (Aylmer):

  • Ends on the Voyageurs Pathway
  • 5 km to the Aylmer Marina
  • 5.4 km to the Champlain Bridge

In Ottawa (Britannia):

  • Ends near Mud lake
  • 1.1 km from the Ottawa River Pathway
  • 1.3 km to Britannia Beach
  • 2.3 km to Lincoln fields OC Transpo Station
  • 6.8 km to the Champlain Bridge

Possible design, may change.

795 metres long

7 metres wide

S-shape

3 pillars, 53 metres high above the bridge surface

Project estimate: between $45 million to $70 million

Privately funded and/or crowd funded